Skip to content
Puerto Montt, Chile · Since 2009

Hydraulic, aquaculture and BIM engineering in southern Chile

Water intakes, RAS hatcheries, river modelling, industrial effluents and structures. Every calculation comes with its spreadsheet and model, ready to review and build.

Revit isometric of the sludge settler with its steel structure and access ladder Sludge treatment plant · Revit isometricC01
2009founded
25 yearsof professional experience
150+clients
50+river and flood modelling studies
03 · Sectors

Sectors we serve

Who we work with

Invermar · Salmones Austral · Multix · Sealand · Ventisqueros · Mowi · Cooke Aquaculture · Yadrán · PAS Consultora · G&S Arquitectos · Constructora Luis Navarro

04 · Method

Every number traceable from site visit to sign-off

Site

Visit, survey and a conversation with the people who operate the facility.

Model

HEC-RAS, EPANET, SWMM or CFD depending on the problem. Software calculates; the engineer defines the scenario.

Spreadsheet

Every calculation ends in an Excel spreadsheet with visible assumptions and formulas.

BIM

Revit model with coordinated networks; drawings come from the model.

Report and sign-off

Design criteria in writing and signature of the responsible engineer.

We use artificial intelligence to speed up our work. Calculations are controlled and signed by an engineer.

Need a water intake, a flood study or water for your hatchery?

Let’s talk for 20 minutes and see whether and how we can help.