CFD thermal simulation of electrical rooms
Thermal behaviour of electrical rooms on extreme heat days and during air-conditioning failure.
- Client
- Salmones Austral, Caliboro hatchery
- Region
- Biobío
- Year
- 2026
- Services
- Pipe networks and CFD
- Sector
- Aquaculture and hatcheries

The hatchery’s electrical rooms had to keep operating on extreme heat days and if the air conditioning failed.
We simulated room temperatures for a 40 °C outdoor day, compared natural ventilation, louvres and air conditioning, and calculated the time available before exceeding the allowable temperature after an AC failure. Results were delivered as 24-hour curves and comparison videos.
OpenFOAM, ParaView, Python.
Related projects
CFD of a circular tank and a grit chamber with deflector
Hydraulic check of a tank and improved flow split in a grit chamber.
Hydrodynamic CFD modelling of fish culture tanks
CFD comparison of inlet configurations to improve solids removal.
Sludge treatment plant, Caliboro hatchery
Steel structure, foundations and construction drawings for a sludge treatment plant, modelled in Revit inside an operating hatchery.
Working on something similar?
Tell us the location, type of works and timeline. We will reply with a scope and a proposal.